NY Methodist Hospital Interior Renovation

Interior Renovation
NY Methodist Hospital

Scope of Work: New Framing was done with 2x4 and steel frames. Then we installed the sheetrocks. Then we plastered, taped, primer and painted the walls. Existing flooring was removed up to the baseboard then the floor was leveled and new flooring was installed.

  • interior

Leave a Reply

Your email address will not be published.